|
WINTER SPECIAL -PRE CONSTRUCTION COSTS ARE WAIVED UNTIL FEBRUARY 1, 2012 - SAVINGS UP TO $2300.00 EXCLUDES RESIDENTIAL DEVELOPMENTS RIDGE AVENUE AND STONEYHILL II. |
|
*Measurements are for maximum size home* Sample Floor Plans available at Pine Grove or Skyline Homes, contact us for pricing.Appleville, West ChesterLot rent – Single size lot $392.00 / Double or Wooded size lot $438.00Trash rate: $13.50 / water: $13.50 for first 1000 gallons $7.25 each additional 1000 gallons. Sewer: $6.75 per 1000 gallons.
914 Baldwin Dr. - 28 x 56 max size home Estimated Pre-Construction costs $1,600 + tax
918 Baldwin Dr. - 24 x 52 max size home. Estimated Pre-Construction costs $2,300 + tax
1510 Jonathan Rd. - 24 x 48 max size home (or 16x60) Estimated Pre-Construction costs $2,300 + tax
1512 Jonathan Rd. - Single Wide Lot Estimated Pre-Construction costs $2,300 + tax
1519 Rome Road - 24 x 44 max size home (or 16x54) Estimated Pre-Construction costs $2,300 + tax For Pre Owned Homes for Sale click on the for sale link to your left.
Highland Court, Parkesburg Lot rent –Single size lot $339.00 / $355.00 Trash: $12.00 / Water: $14.50 for the first 1000 gallons $8.25 each additional 1000 gallons. Sewer:$6.75 per 1000 gallons. Sample Floor Plans available at Pine Grove or Skyline Homes, contact us for pricing. 8 Highland Court - 14 X 68 Estimated Pre-construction costs $1,375.00 + tax 26 Highland Court - 14 X 70 Estimated Pre-construction costs $1,375.00 + tax
Honey Brook Manor, Honey Brook Lot rent– Single size lot $326.00 / $344.00 / Double size lot $385.00 Trash rate: $12.00/Water: $16.00 for the first 1000 gallons, $6.75 each additional 1000 gallons... Sewer $33 flat rate. Sample Floor Plans available at Pine Grove or Skyline Homes, contact us for pricing. 9 Vintage Lane - 14 X 66 Estimated Pre-construction costs - $2,000.00 + tax 47 Vintage Lane - 14 x 66 Estimated Pre-construction costs - $2,000.00 + tax 18 Vintage Lane - 14 x 66 Estimated Pre-construction costs - $2,000.00 + tax
Mt. Idy, Downingtown Lot rent –Single size lot $392.00 / Double size lot $438.00 Trash: $145.00 annual fee billed by Township/ Water: $14.50 for the first 1000 gallons, $8.00 each additional 1000 gallons. Sewer $6.25 per 1000 gallons. Sample Floor Plans available at Pine Grove or Skyline Homes, contact us for pricing. 23 Dennis Drive - Will accommodate a single or a double wide home. Estimated Pre-construction costs to be determined.
Stoneyhill, Gap Lot rent –Single size lot $372.00 / Double size lot $412.00 Trash: $12.00 / Water: $15.00 for the first 1000 gallons $7.75 each additional 1000 gallons. Sewer:$32.00 flat rate Sample Floor Plans available at Pine Grove or Skyline Homes, contact us for pricing. 5831 Hilltop Lane - Maximum home size ( 16X70 or 72) Estimated Pre-construction costs - To be determined. 5835 Hilltop Lane - Maximum home size ( 28X70 ) Estimated Pre-construction costs - To be determined. 834 Sunny Lane - Maximum home size to be determined. Estimated Pre-construction costs - To be determined.
Wagon Wheel Estates, Honey Brook Lot rent –Single size lot $357.00 / Double size lot $402.00 Trash: $12.00 / Water: $16.00 for the first 1000 gallons $6.75 each additional 1000 gallons. Sewer:$33.00 flat rate NO LOTS ARE AVAILABLE AT WAGON WHEEL ESTATES. PLEASE LOOK AT AVAILABLE LOTS AT Honey Brook Manor, Honey Brook New Residential Development Choose from many models available customized to fit your individual needs. MISA IS AN AUTHORIZED DEALER OF Sample Floor Plans available at Pine Grove or Skyline Homes, contact us for pricing.
Ridge Ave., Gap (Off of Burkey Road) Just one lot left - Hurry before they are all gone! 826 Ridge Avenue - $430.00+water/sewer/trash Estimated pre-construction costs to be determined
STONEYHILL II, Gap - (On Lime Quarry Road) Sample Floor Plans available at Pine Grove or Skyline Homes, contact us for pricing. 21 lots Lots allocated for single section homes $372.00 plus water, sewer and trash. Estimated pre-construction costs to be determined Lots allocated for multi section homes $425.00 plus water, sewer and trash. Estimated pre-construction costs to be determined
|
|
Copyright MISA Corporation 2009 01/20/2012 |